date of maturity

英 [deɪt ɒv məˈtʃʊərəti] 美 [deɪt əv məˈtʃʊrəti]

n.  到期日; 兑现日期; 偿还日期; 到期;期头

经济



双语例句

  1. The principal amount of a bond which is stated on its face and which the issuer is obligated to pay at the date of maturity.
    票面价值债券的票面价值是票面所列价值,代表发行人在到期日必须支付的金额。
  2. At the maturity date the market value of the bond will be exactly equal to its maturity value, because the issuing corporation will redeem the bond for that amount.
    在到期日,债券的市价将恰好等于其到期值,因为发行公司将偿付该金额。
  3. If the loan is based on more than one deposit certificates, the term of the loan shall be determined according to the earliest date of maturity, except for loans granted by installments.
    若为多张存单质押,以距离到期日时间最近者确定贷款期限,分笔发放的贷款除外。
  4. An endorsement without a specified date is deemed to be made prior to the date of maturity.
    背书未记载日期的,视为在汇票到期日前背书。
  5. The date of maturity of the contract, when the final settlement of transaction is made by exchanging the currencies.
    合约的到期日,即通过交换货币最后清算交易的日期。
  6. The fourth business day prior to an international bond's date of repayment of principal at maturity is the final day on which transactions in that bond may take place through the IBTS.
    透过本系统买卖之国际债券,以到期还本日前第四个营业日为该债券于本系统买卖之最后交易日。
  7. As a bond nears its maturity date, the market price of the bond moves toward the maturity value.
    债券越接近到期日,其市价越接近到期值。
  8. But their longer and sowing date sensitive of days from flowering to maturity ( R1~ R8) was contrary to that of two spring soybean cultivars.
    但开花至成熟天数长,对播季敏感,与春大豆品种明显不同。
  9. For the same type varieties, the date of jointing, heading and maturity gradually delayed and the growth stages gradually increased with latitude increasing.
    同一品种类型,随纬度的升高,拔节期、抽穗期和成熟期逐渐延迟,全生育期依次变长。
  10. Results of this study were presented as follows: 1. China rice Security maturity roughly zonal distribution of early gradually from south to north, northeast earliest, in mid-September. The safe date of maturity was zonality distribution, earlier gradually from south to north.
    主要研究结果如下:1.我国不同稻区的水稻安全成熟期大致呈纬向分布,由南向北逐渐提早。
  11. Delay of heading date for approximately 6 days due to the effect of the region may result in a reduction in living tiller numbers at maturity by one and an increase in ultimate plant height by approximately 6 cm.
    由于它的效应,推迟大约六天抽穗可导致成熟时分蘖数减少一个和植株高度增加约六厘米。